The Channel Tunnel

Characteristics | Technology | Significance | Modern


 

Characteristics

  • Cost: $15 billion
  • Tunnel has 3 tubes which include 1 track each way and a service track
  • Length: 31 miles with 23 of them underwater
  • The Tunnel was built 150 feet under the seabed
  • Fastest way to get between London and Paris
  • Takes 20 minutes for the Euro star train to cross

Return

Technology

  • 95 miles of tunnels were dug
  • 13,000 engineers, technicians and workers helped build the tunnel
  • The rubble removed from the digging of the tunnel was used to increase the size of Britain by 90 acres

 

 

Return

Significance

  • Created a ground link between Great Britain and the rest of Europe