BRABANT FIGHTS AGAINST WATER
Zandkreekdam

The Zandkreekdam.
The closing of the Zandkreek
begins with a excavation in the front of the lock. It's long 140 meter and 20
meter broad. This is a robust dimension with 's is needful for the future,
because the Veerse meer is the back door for shipping from Vlissingen to rest of
the country.
The building of the connection
weir from North Beverland is successfully and in 1959 the creek of sand is 300
meter marrow.
But the shipping is very
important and the lock must be ready, than the creek can be closed.

On the left side the sluice and on the right side the weir.
The last part of the closing
from the Zandkreekdam is done with caissons who al within 4 days are scuttled on
the threshold.
On
5 may 1960 is it so far....
At 2:22 precisely the closing
of the creek is a fact. A historic moment for the habitants of North Beveland,
because of the closing they aren't dependent of the ferry boat any more.
The closing is also a historic moment for Rijkswaterstaat. This is the first of
the three weirs as a part of the three islands plan.