April 26, 1:00 - 1:23 am
Only 6 of the minimum required 30 control rods were down at this point.
The control rods had been raised to increase power. The power raised to
200 mega watts.
There was one last safety system still functioning that would have shut
the reactor down, but it was disabled.
The operators begin the test, cutting off the steam supply to the
remaining turbine. As coolant water began to decrease, the power level
begins to rise.