PRODUCTION
The presence of economic grades of copper mineralisation in LOOLEKOP carbonatite
is unique. Produdction from the open pit is scheduled to continue until
the year 2002,by which the pit will have 58 benches and be 754m deep(357m
below sea level).By that time some 2 250Mt of rock will have been removed
from the pit and 3.4Mt of copper metal produced. From the commencement
of operations until the end of the 1993 financial year, 1839.2Mt of ore
and waste had been removed. From the year 2003, 30 000t of copper
ore will be extracted daily from an underground operation, for at least
20 years.This is expected to result in a further 1.4Mt of copper and numerios
by-products by-products being produced by 2023.