The disaster of '53The DeltaworksThe plan for the DeltaworksFinancesDamsHollandse IJssel StormvloedkeringZandkreekdamVeersegatdamGrevelingendamBrouwersdamVolkerakdamHaringvlietdamOosterscheldedamSt. PhilipsdamOesterdamMaeslantkeringTimelineTotal summary of the damsWhat's changedGuided TourSearch over the siteHelpExtra stuffWho built this site, and how.

phildam.gif (2832 bytes)

GeneralWhyTroublesThe planSluicesConstruction

Nautical traffic to the Oosterschelde must be ensured. This is don by locks but at the same time pollution of the different types of water must be prevented. A special lock with a salt- and fresh water separation- system was developed an built. Construction of locks