The disaster of '53The DeltaworksThe plan for the DeltaworksFinancesDamsHollandse IJssel StormvloedkeringZandkreekdamVeersegatdamGrevelingendamBrouwersdamVolkerakdamHaringvlietdamOosterscheldedamSt. PhilipsdamOesterdamMaeslantkeringTimelineTotal summary of the damsWhat's changedGuided TourSearch over the siteHelpExtra stuffWho built this site, and how.

grevdam.gif (3372 bytes)

GeneralThe planThe constructionCable railwayMeasurementsSluiceBridge

Across the lock a bridge for traffic had to be made and on the dam a two lane road was built. Parallel to this road an extra lane was created for cyclists. the bridge has a width of 8 meters for cars and 3.25 meters for the parallel lane including the verge. The bottom side of the bridge is on a height of 6.5 meters +NAP so most of the ships could pass. On occasion the bridge is lifted. Water