| 3.
After inserting the film in the left film cavity,
make sure the roll shafts have locked the new
spool in place by pushing the film rewind knob
down. Pull the lead film just enough to feed it
into the film takeup reel. DO NOT pull it more
than two inches past the reel. |
4.
Feed the lead into the film takeup reel. Make
sure it is at least several mm in. Then pull the
film advance lever one complete cycle, while very
gently holding the film flat against the camera
for a small amount of resistance. |